HIGH STREET over MELVIN RIVER

0.2 MI. RTE.109 · County 003, New Hampshire · Built 1977 · 2 Lanes · 267 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
025901410006800
Year Built
1977
Reconstructed
2009
Length
6.1 m (20 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
267
Material
Steel
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.