NH109 over SHANNON BROOK

3.3 MI FROM TUFTONBORO TL · County 003, New Hampshire · Built 1929 · 2 Lanes · 2,514 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
017601860019300
Year Built
1929
Reconstructed
2015
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
2,514
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.