NH 25 over RED HILL RIVER

3.8 MI FROM CTR HARBOR TL · County 003, New Hampshire · Built 1940 · 2 Lanes · 9,873 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
017601360021500
Year Built
1940
Reconstructed
1984
Length
8.2 m (26.9 ft)
Max Span
7 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
9,873
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.