UPPER ROAD over BEARCAMP RIVER

2.1 MI FROM NH RTE 113 · County 003, New Hampshire · Built 1950 · 2 Lanes · 96 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
023301700009500
Year Built
1950
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
96
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.