YOUNG MOUNTAIN RD over COLD RIVER

160 FT FROM NH113A · County 003, New Hampshire · Built 2018 · 1 Lanes · 96 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
023301930014200
Year Built
2018
Length
16 m (52.5 ft)
Max Span
12.2 m
Width
4.2 m (13.8 ft)
Lanes
1
Daily Traffic
96
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.