NH113 over BEARCAMP RIVER

2.6 MI FROM RTE 109 · County 003, New Hampshire · Built 1927 · 2 Lanes · 716 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023301870008500
Year Built
1927
Reconstructed
2014
Length
11.9 m (39 ft)
Max Span
11 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
716
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000