NH113 over COLD RIVER

2.3 MI E NO. SANDWICH VIL · County 003, New Hampshire · Built 1958 · 2 Lanes · 544 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023302380009200
Year Built
1958
Reconstructed
1996
Length
44.5 m (146 ft)
Max Span
21.3 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
544
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.