BENNETT STREET over POND BROOK

0.9 MI FR INTERVALE RD · County 003, New Hampshire · Built 1979 · 2 Lanes · 58 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023301780016300
Year Built
1979
Length
17.4 m (57.1 ft)
Max Span
15.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
58
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.