OSSIPEE MT ROAD over HALFWAY BROOK

1.6 MI. SANDWICH TL · County 003, New Hampshire · Built 1949 · 2 Lanes · 256 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
017601830023100
Year Built
1949
Reconstructed
1996
Length
11.9 m (39 ft)
Max Span
11.3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
256
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.