SAND HILL ROAD over BAKER RIVER

.06 MI FROM NH RTE 25 · County 009, New Hampshire · Built 1928 · 2 Lanes · 410 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
022500790009200
Year Built
1928
Reconstructed
1989
Length
31.1 m (102 ft)
Max Span
29.6 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
410
Material
Steel
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.