MAIN STREET over BAKER RIVER

0.4 MI N JCT RTE 25 · County 009, New Hampshire · Built 1998 · 2 Lanes · 1,635 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
022501320007000
Year Built
1998
Length
48.8 m (160.1 ft)
Max Span
47.2 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,635
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.