NH 25 NH118 over S BRANCH BAKER RIVER

0.1 MI W OF RUMNEY TL · County 009, New Hampshire · Built 1978 · 2 Lanes · 3,993 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
026901660005900
Year Built
1978
Length
66.4 m (217.8 ft)
Max Span
25.6 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
3,993
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.