DUFOUR ROAD over S BRANCH BAKER RIVER

0.19MI NH25 · County 009, New Hampshire · Built 1981 · 1 Lanes · 96 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
026901620007200
Year Built
1981
Reconstructed
2014
Length
19.4 m (63.6 ft)
Max Span
17.4 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
96
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.