THAYER MTN ROAD over S BRANCH BAKER RIVER

.09 MI FR NO DORCHESTER · County 009, New Hampshire · Built 1999 · 1 Lanes · 96 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
026901430005900
Year Built
1999
Length
27.3 m (89.6 ft)
Max Span
26.1 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
96
Material
Steel
Design
Other
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.