EVANS ROAD over S BRANCH BAKER RIVER

60 FT FR NO DORCHESTER R · County 009, New Hampshire · Built 1937 · 1 Lanes · 96 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
026901360005300
Year Built
1937
Reconstructed
2013
Length
13.6 m (44.6 ft)
Max Span
11.9 m
Width
5.8 m (19 ft)
Lanes
1
Daily Traffic
96
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.