US 4 NH 16 SP TPK over NB RAMP

N SP TPK I-95 INTERCHANGE · County 015, New Hampshire · Built 1971 · 2 Lanes · 12,881 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021701990013900
Year Built
1971
Length
44 m (144.4 ft)
Max Span
42.7 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
12,881
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.