I-95 SB over NB RAMP

SP TPK I-95 INTERCHANGE · County 015, New Hampshire · Built 1972 · 3 Lanes · 30,667 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021701840012400
Year Built
1972
Length
38.7 m (127 ft)
Max Span
38.1 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
30,667
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.