I-95 SB CONNECTOR over I-95 NB RAMP

SP TPK I-95 INTERCHANGE · County 015, New Hampshire · Built 1972 · 2 Lanes · 5,680 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021701800012200
Year Built
1972
Length
35.4 m (116.1 ft)
Max Span
34.7 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
5,680
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.