I-95 SB CONNECTOR over I-95 NB

SP TPK I-95 INTERCHANGE · County 015, New Hampshire · Built 1972 · 2 Lanes · 5,680 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
021701830012100
Year Built
1972
Length
47.5 m (155.8 ft)
Max Span
46.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
5,680
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.