I-95 NB over US 4 NH 16 SP TPK

I-95 SP TPK INTERCHANGE · County 015, New Hampshire · Built 1971 · 3 Lanes · 38,772 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
021701970012200
Year Built
1971
Length
38.7 m (127 ft)
Max Span
37.2 m
Width
22.6 m (74.1 ft)
Lanes
3
Daily Traffic
38,772
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.