I-95 SB over US 4 NH 16 SP TPK

I-95 SP TPK INTERCHANGE · County 015, New Hampshire · Built 1970 · 3 Lanes · 35,888 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021701980012300
Year Built
1970
Length
38.7 m (127 ft)
Max Span
37.2 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
35,888
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.