NH101 EB over BRIDGE STREET

1.2 MI W. JCT RTE 28 BYP · County 011, New Hampshire · Built 1961 · 2 Lanes · 19,964 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
016101280012700
Year Built
1961
Reconstructed
1977
Length
18.3 m (60 ft)
Max Span
16.5 m
Width
18.6 m (61 ft)
Lanes
2
Daily Traffic
19,964
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.