I-93 NB NH101 EB over HANOVER STREET

1.8 MI W JCT RTE 28 A · County 011, New Hampshire · Built 1960 · 4 Lanes · 47,490 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016101380012600
Year Built
1960
Reconstructed
1992
Length
25.3 m (83 ft)
Max Span
23.5 m
Width
26.2 m (86 ft)
Lanes
4
Daily Traffic
47,490
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.