I-93 SB over STEVENS POND

0.1 MI N BRIDGE ST · County 011, New Hampshire · Built 1976 · 3 Lanes · 28,328 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
016101270012200
Year Built
1976
Length
191.6 m (628.6 ft)
Max Span
23.5 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
28,328
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.