I-93 SB over BRIDGE STREET

1.2 MI W JCT NH28 BYP · County 011, New Hampshire · Built 1977 · 3 Lanes · 28,328 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
016101280012400
Year Built
1977
Reconstructed
1999
Length
20.1 m (65.9 ft)
Max Span
18.3 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
28,328
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.