I-93 NB over STEVENS POND

0.1 MI N BRIDGE ST. · County 011, New Hampshire · Built 1977 · 4 Lanes · 36,942 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
016101230011800
Year Built
1977
Length
307.8 m (1009.8 ft)
Max Span
44.2 m
Width
22.7 m (74.5 ft)
Lanes
4
Daily Traffic
36,942
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.