I-93 NB over BRIDGE STREET

1.2 MI W JCT NH 28 BYP · County 011, New Hampshire · Built 1977 · 3 Lanes · 25,082 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
016101280012600
Year Built
1977
Reconstructed
1999
Length
25.9 m (85 ft)
Max Span
24.4 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
25,082
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.