NH 12A over NHRR
100 FT FROM JCT RTE 10 · County 009, New Hampshire · Built 1949 · 2 Lanes · 9,117 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
43.643983, -72.310158
This bridge is in worse condition than 92.3% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 77 years old.
Nearby Bridges
US 4 over CONNECTICUT RIVER
Built 2015
US 4 over CONNECTICUT RIVER
Built 2015
C2002 over WHITE RIVER
Built 1991
NH 12A over MASCOMA RIVER
Built 1977
US 00005 ML over US 5 OVER WHI R & NECRR
Built 1968
US 4 NH 10 over MASCOMA RIVER CSX
Built 1945
I-89 NB over NH 12A
Built 2012
I-89 SB over NH 12A
Built 2012
I-89 NB over PLAZA CONNECTOR ROAD
Built 2012
I-89 SB over PLAZA CONNECTOR ROAD
Built 2012
Bridge Details
- Structure #
- 014400620011700
- Year Built
- 1949
- Length
- 44.2 m (145 ft)
- Max Span
- 16.8 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 9,117
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.