US 4 over CONNECTICUT RIVER

0.1 MI FROM VERMONT SL · County 009, New Hampshire · Built 2015 · 2 Lanes · 11,594 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
014400580012800
Year Built
2015
Length
137.7 m (451.8 ft)
Max Span
54.3 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
11,594
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.