NH 12A over MASCOMA RIVER
2.7 MI. N. PLAINFIELD TL · County 009, New Hampshire · Built 1977 · 4 Lanes · 12,844 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.633961, -72.3174
This bridge is in worse condition than 77.3% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 49 years old.
Nearby Bridges
I-89 NB over NH 12A
Built 2012
I-89 SB over NH 12A
Built 2012
I-89 NB over PLAZA CONNECTOR ROAD
Built 2012
I-89 SB over PLAZA CONNECTOR ROAD
Built 2012
I-89 SB OFF RAMP over PLAZA CONNECTOR ROAD
Built 2012
I-89 NB over CONNECTICUT RIVER NECRR
Built 1966
I-89 NB over CONNECTICUT RIVER NECRR
Built 1966
I-89 SB over CONNECTICUT RIVER NECRR
Built 1966
I-89 SB over CONNECTICUT RIVER NECRR
Built 1966
I 00089 ML over I 89 OVER TH NO 78
Built 1965
Bridge Details
- Structure #
- 014400550010300
- Year Built
- 1977
- Length
- 34.7 m (113.8 ft)
- Max Span
- 33.5 m
- Width
- 19.7 m (64.6 ft)
- Lanes
- 4
- Daily Traffic
- 12,844
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.