I-89 SB OFF RAMP over PLAZA CONNECTOR ROAD

SB OFF RAMP AT EXIT 20 · County 009, New Hampshire · Built 2012 · 1 Lanes · 8,958 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
014400480009800
Year Built
2012
Length
16.8 m (55.1 ft)
Max Span
14.5 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
8,958
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.