I-89 SB over CONNECTICUT RIVER NECRR

0.04 MI FROM VT. SL. · County 027, Vermont · Built 1966 · 2 Lanes · 19,185 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
200089B01S14082
Year Built
1966
Length
257.9 m (846.1 ft)
Max Span
45.7 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
19,185
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,718,000
Total Project Cost
$3,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.