I-89 NB over PLAZA CONNECTOR ROAD

0.4 MI EAST OF VT/NH LINE · County 009, New Hampshire · Built 2012 · 3 Lanes · 28,690 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
014400490010000
Year Built
2012
Length
17.1 m (56.1 ft)
Max Span
14.9 m
Width
22.7 m (74.5 ft)
Lanes
3
Daily Traffic
28,690
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.