I-89 SB over NH 12A

0.5 MI FROM VT S.L. · County 009, New Hampshire · Built 2012 · 3 Lanes · 18,618 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
014400520009900
Year Built
2012
Length
48.2 m (158.1 ft)
Max Span
46.1 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
18,618
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.