I-89 NB over NH 12A

0.5 MI FROM VT. S.L. · County 009, New Hampshire · Built 2012 · 2 Lanes · 19,291 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
014400520010000
Year Built
2012
Length
48.2 m (158.1 ft)
Max Span
46.1 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
19,291
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000