BROOKVIEW DRIVE over BEAVER BROOK

HOOKSETT · County 013, New Hampshire · Built 2017 · 2 Lanes · 571 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
012801340003400
Year Built
2017
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
571
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.