NH 28A over I-93

0.1 MI HOOKSETT TL · County 011, New Hampshire · Built 1976 · 2 Lanes · 6,695 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016101020010800
Year Built
1976
Reconstructed
2021
Length
93.6 m (307.1 ft)
Max Span
45.7 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
6,695
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.