I-93 NB over US 3 NH 28

0.2 MI MANCHESTER TL · County 013, New Hampshire · Built 1976 · 4 Lanes · 34,221 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.023161, -71.443964

This bridge is in worse condition than 17.8% of bridges in County 013. The average bridge in New Hampshire is 0 years old; this one is 50 years old.

Nearby Bridges

Bridge Details

Structure #
012800960004900
Year Built
1976
Reconstructed
1998
Length
45.1 m (148 ft)
Max Span
43.3 m
Width
25.9 m (85 ft)
Lanes
4
Daily Traffic
34,221
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.