I-93 NB over NH 3A

1.0 MI N MANCHESTER CL · County 013, New Hampshire · Built 1976 · 4 Lanes · 25,712 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012800760007900
Year Built
1976
Reconstructed
2012
Length
42.7 m (140.1 ft)
Max Span
40.8 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
25,712
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.