I-93 FEE TPK over CROSS ROAD

2.2 MI NO. MANCHESTER TL · County 013, New Hampshire · Built 1956 · 7 Lanes · 82,029 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
012800710011400
Year Built
1956
Reconstructed
1976
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
44.2 m (145 ft)
Lanes
7
Daily Traffic
82,029
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.