I-93 FEE TPK over RAMP A-B

2.7 MI NO MANCHESTER TL · County 013, New Hampshire · Built 1957 · 16 Lanes · 79,640 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
012800710013800
Year Built
1957
Reconstructed
1978
Length
14.3 m (46.9 ft)
Max Span
12.2 m
Width
122.5 m (401.9 ft)
Lanes
16
Daily Traffic
79,640
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.