I-93 FEE TPK over DOW ROAD

1.7 MI JCT I-89 · County 013, New Hampshire · Built 1957 · 6 Lanes · 78,501 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
002701580013700
Year Built
1957
Reconstructed
1978
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Lanes
6
Daily Traffic
78,501
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.