I-89(RAMP A) over TURKEY RIVER

BOW INTERCHANGE · County 013, New Hampshire · Built 1959 · 3 Lanes · 30,513 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
002701350016100
Year Built
1959
Length
10.1 m (33.1 ft)
Max Span
4.1 m
Width
36.6 m (120.1 ft)
Lanes
3
Daily Traffic
30,513
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.