I-93 FEE TPK NB over I-89 TURKEY RIVER

BOW INTERCHANGE. · County 013, New Hampshire · Built 2014 · 2 Lanes · 34,805 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
002701360015800
Year Built
2014
Length
80.2 m (263.1 ft)
Max Span
45.7 m
Width
19.2 m (63 ft)
Lanes
2
Daily Traffic
34,805
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.