GRANDVIEW ROAD over I-93 FEE TPK
0.4 MI JCT I-89 · County 013, New Hampshire · Built 1978 · 2 Lanes · 1,142 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.166089, -71.524033
This bridge is in worse condition than 74.2% of bridges in County 013. The average bridge in New Hampshire is 0 years old; this one is 48 years old.
Nearby Bridges
I-93 FEE TPK SB over I-89 TURKEY RIVER PED
Built 2014
I-93 FEE TPK NB over I-89 TURKEY RIVER
Built 2014
I-93 NB C-D ROAD over I-89 TURKEY RIVER PED
Built 1978
I-89(RAMP A) over TURKEY RIVER
Built 1959
I-89(RAMP D) over TURKEY RIVER
Built 1987
I-89 over SOUTH STREET
Built 1959
I-89(RAMP F) over TURKEY RIVER
Built 1959
NH 3A over I-93 FEE TPK
Built 2015
I-93 FEE TPK NB over CSX
Built 1957
I-93 FEE TPK SB over CSX
Built 1957
Bridge Details
- Structure #
- 002701360015500
- Year Built
- 1978
- Reconstructed
- 2007
- Length
- 100.9 m (331 ft)
- Max Span
- 50.9 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 1,142
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.