I-93 FEE TPK NB over CSX
.2MINJCT RT3-A · County 013, New Hampshire · Built 1957 · 3 Lanes · 43,056 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.181536, -71.528206
This bridge is in worse condition than 74.2% of bridges in County 013. The average bridge in New Hampshire is 0 years old; this one is 69 years old.
Nearby Bridges
I-93 FEE TPK SB over CSX
Built 1957
NH 3A over I-93 FEE TPK
Built 2015
I-93 FEE TPK NB over HALL STREET
Built 1958
I-93 FEE TPK SB over HALL STREET
Built 1958
I-89(RAMP A) over TURKEY RIVER
Built 1959
I-93 NB C-D ROAD over I-89 TURKEY RIVER PED
Built 1978
I-93 FEE TPK NB over I-89 TURKEY RIVER
Built 2014
I-93 FEE TPK SB over I-89 TURKEY RIVER PED
Built 2014
I-89(RAMP D) over TURKEY RIVER
Built 1987
US 3 over MERRIMACK RIVER
Built 1998
Bridge Details
- Structure #
- 005202030009000
- Year Built
- 1957
- Reconstructed
- 1988
- Length
- 58.2 m (190.9 ft)
- Max Span
- 21.6 m
- Width
- 22.3 m (73.2 ft)
- Lanes
- 3
- Daily Traffic
- 43,056
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.