US 3 over MERRIMACK RIVER

0.1 MI EAST JCT I-93 · County 013, New Hampshire · Built 1998 · 4 Lanes · 26,707 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
005201850010400
Year Built
1998
Length
212.4 m (696.9 ft)
Max Span
45.7 m
Width
29 m (95.1 ft)
Lanes
4
Daily Traffic
26,707
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.