I-93 NB C-D ROAD over I-89 TURKEY RIVER PED

AT BOW INTERCHANGE · County 013, New Hampshire · Built 1978 · 2 Lanes · 22,560 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
002701360016100
Year Built
1978
Reconstructed
2002
Length
74.7 m (245.1 ft)
Max Span
17.7 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
22,560
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.