I-89(RAMP F) over TURKEY RIVER

BOW INTERCHANGE · County 013, New Hampshire · Built 1959 · 2 Lanes · 3,904 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
002701300016100
Year Built
1959
Reconstructed
1980
Length
20.7 m (67.9 ft)
Max Span
19.8 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
3,904
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.