RIVER ROAD over CSX

1.4 MI FROM HOOKSETT TL · County 013, New Hampshire · Built 1989 · 2 Lanes · 567 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
002701940011500
Year Built
1989
Length
15.2 m (49.9 ft)
Max Span
14 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
567
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.